|
PRS 145 - Load Moment Indicator |
|
The PAT Kreuger PRS 1445 displays a full range of precise information in the operator’s cab. Designed for use on mobile cranes, the PRS 145 is installed and calibrated to the load chart of each crane—including specific load and geometric limits on boom length, angle, and operating radius. The PAT Kreuger PRS 145 load moment indicator gives the operator the information necessary to fully utilize the cranes capacity while keeping within the working limits of the crane.
Features
- Displays actual and allowable load, boom length, boom angle, and load radius
- Alerts the operator in an impending two block condition
- Integrated light bar provides a quick reference of the crane’s utilization
- Quick and easy set-up through the operator’s console
- User-friendly console
- Meets SAE and ANSI B-30.5 standards
Improves Efficiency and Productivity
Quick and Easy calibration -- Exclusive AccuCal calibration procedure done through the operator’s console.
Measures True Load Moment — By measuring true load moment, the PAT Kreuger PRS 156 senses boom dynamics, load swingout, wind loading, shock load and effects of boom deflection.
Self-Diagnostics – Continuously monitors system and sensors. Error codes are displayed to help identify problems and minimize downtime.
Control Lever Lockout — When the LMI system senses and overload or an impending two-block condition, the PRS 145 provides a relay output which can be used to engage an optional lever lockout.
|