SkyAzúl - Equipment Solutions
Cambiar el Idioma: Cambiar el Idioma:
HomeAboutContact Us
SkyAzúl was founded in 2002 by Brian Considine, former Product Manager for PAT
Request A QuoteNewsCranes and Machinery for SaleResources

Product Information view all our products

User-friendly graphic console with three large display options
Figure 1
Meets SAE and ANSI B-30.5 standards
Figure 2
By measuring true load moment, the Mark 4K senses boom dynamics, load swingout, wind loading, shock load and effects of boom deflection.
Figure 3

Mark 4K - Load Moment Indicator


PAT Krueger The PAT Kreuger Mark 4K Load Moment Indicator displays a full range of precise information in the operator’s cab. Designed for use on mobile cranes, the Mark 4K Load Moment Indicator is installed and calibrated to the load chart of each crane - including specific load and geometric limits on boom length, angle, and operating radius. Due to its various display options, the PAT Kreuger Mark 4K Load Moment Indicator meets the requirements of even the most demanding cranes with many configurations. The PAT Kreuger Mark 4K Load Moment Indicator gives the operator the information necessary to fully utilize the cranes capacity while keeping within the working limits of the crane.

Features

  • User-friendly graphic console with three large display options
  • Displays actual and allowable load, boom length, boom angle, and load radius
  • Alerts the operator in an impending two block condition
  • Integrated light bar provides a quick reference of the cranes utilization
  • Optional data logger
  • Meets SAE and ANSI B-30.5 standards
  • Supports 16 different languages

Improves Efficiency and Productivity

Quick & Easy Calibration – Setup and calibration done quickly and easily with Windows based software.

Measures the True Load Moment – By measuring true load moment, the PAT Kreuger Mark 4K senses boom dynamics, load swingout, wind loading, shock load and effects of boom deflection.

Self-Diagnostics – Continuously monitors system and sensors. Error codes are displayed to help identify problems and minimize downtime.

Control Lever Lockout – When the LMI system senses an overload or an impending two-block condition, the Mark 4K provides a relay output which can be used to engage an optional lever lockout.

Request a Quote
View Literature